Jaipur, Rajasthan +91-704-907-4974 ocrws.phaseone@gmail.com
  • facebook
  • twitter
  • pinterest
  • instagram
Omaxe City Residents Welfare Society
  • Home
  • About Us
  • Gallery
  • Timeline
  • Our Team
  • Raise a Complaint
  • Home
  • Blog
  • Wall work started at the end of Rameshwaram road
Previous Next

Wall work started at the end of Rameshwaram road

Post navigation

Fogging work started
OCRWS Phase 1 Election – 2024

About Us

Omaxe City, an integrated township has been planned on Ajmer expressway, over an expanse of about 500 acres, with plots, independent floors and villas.

  • facebook
  • twitter
  • pinterest
  • instagram

Useful Links

  • Home
  • About Us
  • Gallery
  • Timeline
  • Our Team
  • Raise a Complaint

Address

Omaxe City, Bad Ke Bala ji, Jaipur Ajmer express highway (157.44 mi) Sanganer 302026

Latest News

Yoga camp is organised by RWA on 21st June on International Yoga Day

Yoga camp is organised by RWA on 21st June on International Yoga Day

In process to supply water through pipeline, a pipeline testing was made on 16th June 2024. All the issues came during the testing were noted down for rectification.

In process to supply water through pipeline, a pipeline testing was made on 16th June 2024. All the issues came during the testing were noted down for rectification.

Motor installed in Tikona Park borewell at 400ft

Motor installed in Tikona Park borewell at 400ft

« Previous 1 … 4 5 6 7 8 … 35 Next »
© 2023 OCRWS. All Rights Reserved.