Jaipur, Rajasthan +91-704-907-4974 ocrws.phaseone@gmail.com
  • facebook
  • twitter
  • pinterest
  • instagram
Omaxe City Residents Welfare Society
  • Home
  • About Us
  • Gallery
  • Timeline
  • Our Team
  • Raise a Complaint
  • Home
  • Blog
  • Wall work started at the end of Rameshwaram road
Previous Next

Wall work started at the end of Rameshwaram road

Post navigation

Fogging work started
OCRWS Phase 1 Election – 2024

About Us

Omaxe City, an integrated township has been planned on Ajmer expressway, over an expanse of about 500 acres, with plots, independent floors and villas.

  • facebook
  • twitter
  • pinterest
  • instagram

Useful Links

  • Home
  • About Us
  • Gallery
  • Timeline
  • Our Team
  • Raise a Complaint

Address

Omaxe City, Bad Ke Bala ji, Jaipur Ajmer express highway (157.44 mi) Sanganer 302026

Latest News

OCRWS Phase 1 Election – 2024

OCRWS Phase 1 Election – 2024

Wall work started at the end of Rameshwaram road

Wall work started at the end of Rameshwaram road

Fogging work started

1 2 3 … 35 Next »
© 2023 OCRWS. All Rights Reserved.